![adjust station and backsight trimble business center adjust station and backsight trimble business center](https://geo-matching.com/uploads/default/n/w/nwa-with-contraints-error-elipseswhite.jpg)
- #Adjust station and backsight trimble business center how to
- #Adjust station and backsight trimble business center manual
The TSC2 data collector is then powered up and connected to the total station via cable or bluetooth. The total station is then placed and locked onto the tribrach. First the tripod and tribrach are centered over the control point and rough leveled. Total Station Setup In a conventional survey, a station setup must be performed to orientate the instrument. Revised February,Ħ The Total Station and Trimble TSC2 Setup C. The data collector will then return to the main desktop screen. 3-4 Revised February, 2013ĥ Chapter 3 When the settings have been changed click on the ok icon as indicated by the red arrow in the upper right portion of the screen. To change any of these parameters, use the stylus to highlight a setting as indicated by the red arrow and then use the up or down arrows (red oval) to make the appropriate change. Revised February,Ĥ The Total Station and Trimble TSC2 Setup The Settings screen displays the current time zone, time, and date. Setting the Date and Time To set or check the date and time on the TSC2, tap the stylus on the date and time as indicated by the red oval. Trimble Desktop Screen When the TSC2 is turned on, the main Trimble desktop screen will be displayed. Pressing Enter on the keypad when the desired icon is highlighted will achieve the same results.
#Adjust station and backsight trimble business center how to
Throughout this chapter, the term tap is used to illustrate how to select various commands from the TSC2 screen with a stylus.
#Adjust station and backsight trimble business center manual
Refer to Chapter 7 in this manual for more information on transferring files to the TSC2. However, it is not necessary to upload these files to conduct a survey. The most common files are feature code lists, project control files, design alignments, and staking files. Pre-Loaded Files There are many types of files that can be loaded on the Trimble TSC2 data collector prior to collection or stake-out surveys. The Total Station and Trimble TSC2 Setup A. Review the Measurement Data Error Example Compensator out of toleranceĢ The Total Station and Trimble TSC2 Setup 3. Station Setup Instrument Point Backsight Point G. Data Collector Jobs Create a New Job Open an Existing Job F. Survey Styles Edit an Existing Survey Style Create a New Survey Style E. Total Station Setup Correction Settings D. Trimble Desktop Screen Setting the Date and Time C. 1 Chapter 3 The Total Station and Trimble TSC2 Setup Table of Contents A.